The problem
John Dada: "The safe disposal of plastic waste is a perennial problem that gets worse by the day, so we have to be committed to efforts to control it".
The solution
The idea is for a 3 month feasibility study which covers the following issues in preparation for setting up a pilot production unit:
1 Identify the density and nature of the waste.
2 Evaluate the specifications and market for plain tiles and the economics of production
3 Evaluate the demand for rain-water harvesting systems that could be produced from the tiles, potential market outlets and economics of production
4 Identify the market for other products that could be produced from the tiles and assess the economics of production
5 Research local availability of resources needed for construction and operation of a pilot plant